• HOME
  • NEWS
  • ALERTS
  • LAWSUITS
  • DEVELOPERS
  • RECORD
  • LINKS
  • CONNECT
  • ARCHIVED DOWNLOADS
  • ARCHIVED PUBLIC RECORD
  • ARCHIVED PROPOSALS
  • ARCHIVED NOP RECORD
  • ARCHIVED SP/DEIR RECORD
  • ARCHIVED MISCELLANEA
  • More
    • HOME
    • NEWS
    • ALERTS
    • LAWSUITS
    • DEVELOPERS
    • RECORD
    • LINKS
    • CONNECT
    • ARCHIVED DOWNLOADS
    • ARCHIVED PUBLIC RECORD
    • ARCHIVED PROPOSALS
    • ARCHIVED NOP RECORD
    • ARCHIVED SP/DEIR RECORD
    • ARCHIVED MISCELLANEA
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • HOME
  • NEWS
  • ALERTS
  • LAWSUITS
  • DEVELOPERS
  • RECORD
  • LINKS
  • CONNECT
  • ARCHIVED DOWNLOADS
  • ARCHIVED PUBLIC RECORD
  • ARCHIVED PROPOSALS
  • ARCHIVED NOP RECORD
  • ARCHIVED SP/DEIR RECORD
  • ARCHIVED MISCELLANEA

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Eldridge For All

Eldridge For AllEldridge For All

Documents, Media Links, and Items for the Public Record

The SDC land-use planning process has generated countless official documents, an extensive public record, and a whole lot of press. Many important items falling into these categories dated prior to 2025 can be found on the ARCHIVED pages of this website.


Below, you will find:

  • Links to the most recent media articles
  • Key documents generated as of 2025
  • Items of interest for the public record. 
  • A pdf of the 2019 Enabling Legislation


Note: Many newspapers and magazines have a "firewall," meaning that without a subscription you might not be able access the article. Please consider subscribing to our local press. The Kenwood Press routinely reports on the SDC, with Tracy Salcedo writing most of those articles. We are unable to create links to individual Kenwood Press articles. Whenever a particularly informative (re SDC planning process) is published, we will highlight it as a pdf. 

2025 scoping comments

Scoping comments from lead groups will be posted here in chronological order.

11.4.2025 GEHS letter re demolition (pdf)Download

2025 Key Documents

5.6.25 Attachment 1 Scope of Work for Rogal EIR (pdf)Download
5.6.25 BOS Agenda Item 18 Summary Report (pdf)Download
March 6 2025 Rogal Completeness Letter (pdf)Download

2025 items of interest for the public record

6.6.2025 GEF Rogal Invite (pdf)Download
4.6.2025 VOTMA comments to PC re GP Safety Element (pdf)Download
1.6.2025 KP SDC Timeline (pdf)Download
5.6.25 BOS Submission Jim Price (pdf)Download
4.30.25 VOTMA Consistency Letter to BOS (pdf)Download
4.30.25 VOTMA comments on Draft Safety Element (pdf)Download
4.23.25 SLT_Comments_re_Eldridge_Renewal_Proposal_04-24-25 (pdf)Download
4.23.25 V Hill Project Consistency letter to county (pdf)Download
4.11.25 GEHS Compliance Letter to BOS (pdf)Download
Feb 25 2025 KLD Evac Study FAQs (pdf)Download
2.4.25 Rogal Project Description (pdf)Download
Jan 22 2025 SV Next 100 Lawsuit (pdf)Download

2025 Print Media Downloads

6.1.2025 KP T Salcedo SDC maintenance (pdf)Download
5.25.2025 PD LTE BOS at fault (pdf)Download
5.24.2025 Vanguard New SB 607 (pdf)Download
5.22.2025 Sonoma Valley Sun D. Bolling (pdf)Download
5.20.2025 PD LTE County responsible (pdf)Download
5.16.25 Press DEM LTS Chris Koch (pdf)Download
5.13.25 SV Sun Will Shonbrun (pdf)Download
5.3.25 SV Sun LTE Will Shonbrun (pdf)Download

2025 Print media links

5.15. Kenwood Press DGS pullout 5.15.25 Kenwood Press D&B contract5.12.25 Press Dem SDC historical artifacts5.7.25 Press Democrat Phil Barber D&B contract2.17.25 Press Democrat Sonoma House2.15.25 SV Sun Rogal 4th App2.12.25 Sonoma IT Wildfire Evac Study2.10.25 SV Sun Wildfire Evacuation2.4.25 SV Sun Editorial1.24.25 Press Democrat SV Next 100 Lawsuit1.22.25 SV Sun Next 100 Lawsuit

2019 Enabling Legislation

Download PDF

  • Copyright © 2018 Save Our Space - All Rights Reserved.

Powered by

  • HOME
  • NEWS
  • ALERTS
  • LAWSUITS
  • DEVELOPERS
  • RECORD
  • LINKS
  • CONNECT
  • ARCHIVED DOWNLOADS
  • ARCHIVED PUBLIC RECORD
  • ARCHIVED PROPOSALS
  • ARCHIVED NOP RECORD
  • ARCHIVED SP/DEIR RECORD
  • ARCHIVED MISCELLANEA

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept

SDC Project Status

The County re-hired consultant Dyett & Bhatia, and environmental review will soon begin on the "Specific Plan with a Builder's Remedy overlay." Stay tuned for information on opportunities for public input during the EIR 30-day Public Scoping Period anticipated to begin in late June. Detailed instructions will soon be posted here on the ALERTS page.

Alerts